Rehabilitation of the federal motorway, Germany

The concrete revetment on a length of 4.5 km between Hanover and Kassel was rehabilitated.

The section from the Hildesheimer Börde area to the village of Derneburg of the federal motorway A 7 between Hanover and Kassel - an important connection for the North-South traffic - was built in 1958/62. On the occasion of the repair works of the concrete revetment on a length of 4.5 km of the section in question, each concrete slab was rehabilitated by injection, then asphalted.

Services for earthworks and road construction:

  • Reinforcement of the existing concrete road surface by applying an 8 cm layer asphalt binder course and a 4 cm surface course
  • Cleaning of the central reserve and hard shoulder drainage system and adaptation to the new roadway height
  • Adaptation of the roadside space to the new roadway height
  • Road widening
  • Marking
  • Renewal of the existing protection and guiding devices

Traffic routeing:

In both directions, the traffic was channelled past the construction site. During each construction phase, the entry and exit towards the Hildesheimer Börde petrol station and the service area remained accessible.

Recommended projects