Cookie Policy
Your privacy is important to us! We use cookies which are necessary for the operation of the website. Non-essential cookies are used only with your consent. Learn more
Allow essential cookies onlyAccept all cookies
Inros Lackner Logo Home .
  • Company
  • /
  • Company
    • Profile
    • Staff
    • Network
    • History
    • Contact
  • Competencies
  • /
  • Competencies
    • Project management
    • Maritime Engineering and Port Logistics
    • Urban Infrastructure
    • Survey and Environment
    • Transport Infrastructure
  • Services
  • /
  • Services
    • Building Information Modelling
    • Bridge Design
    • Environmental planning
    • Maritime Engineering
    • Port Operation and Logistics
    • Project Management Services
    • Railway Engineering
    • Renewable Energy
    • Road Engineering
    • Topographical Survey
    • Water supply and wastewater disposal
  • Projects
  • /
  • Projects
    • Urban Infrastructure
    • Maritime Engineering and Port Logistics
    • Survey and Environment
    • Transport Infrastructure
  • News
  • News
    • Latest News
    • Job Openings
  • /
  • EN
  • /
  • FR
  • Profile
  • Staff
  • Network
  • History
  • Contact
  • Project management
  • Maritime Engineering and Port Logistics
  • Urban Infrastructure
  • Survey and Environment
  • Transport Infrastructure
  • Building Information Modelling
  • Bridge Design
  • Environmental planning
  • Maritime Engineering
  • Port Operation and Logistics
  • Project Management Services
  • Railway Engineering
  • Renewable Energy
  • Road Engineering
  • Topographical Survey
  • Water supply and wastewater disposal
  • Urban Infrastructure
  • Maritime Engineering and Port Logistics
  • Survey and Environment
  • Transport Infrastructure
  • Latest News
  • Job Openings
INROS LACKNER
  • Projects
  • Survey and Environment

Survey and Environment

Environmental impact and dredging study for the lagoon of Lomé
Global Tech I offshore wind farm, North Sea
Lomé lagoon network extension, Togo
EnBW Baltic 2 wind farm, Baltic Sea
Management plan for “Special Protection Areas”
Re-construction of River "Oder", Brandenburg

© 2023 
INROS LACKNER Togo SARL
Port de Lomé
BP. 441 Lomé-Togo
Tel.: +228 22 27 06 92

Links

INROS LACKNER SE
INROS LACKNER Cambodia
INROS LACKNER Vietnam
INROS LACKNER hilft

Profile

We uniquely combine local expertise and international engineering know-how.

INROS LACKNER Togo

Imprint 
Contact 
Services

© 2025 Inros Lackner SE – info@inros-lackner.de

Rosa-Luxemburg-Straße 16 - D-18055 Rostock - Tel.: +49 381 4567-80 / Fax.: +49 381 4567-888

Go to top