Toggle navigation
Company
/
Company
Profile
Staff
Network
Our location
Competencies
/
Competencies
Integrated Building Design
Infrastructure & Environment
Structural Engineering and Building Assessment
Geotechnical Engineering
Project and construction management
Services
/
Services
Architectural Design
Building Services (MEP)
Structural Engineering
Civil Engineering
3D Building Assessments
Topographic, Hydrographic, Oceanographic and Geophysical Surveys
Project and Site Management
Monitoring and Testing
Environmental Stewardship
Projects
/
Projects
Integrated Building Design
Infrastructure & Environment
Structural Engineering and Building Assessment
Geotechnical Engineering
Topographic / Hydrographic / Oceanographic / Geophysical / Building Surveys
Project and construction management
Career
Career
Job Openings
Students
Contact
/
EN
Profile
Staff
Network
Our location
Integrated Building Design
Infrastructure & Environment
Structural Engineering and Building Assessment
Geotechnical Engineering
Project and construction management
Architectural Design
Building Services (MEP)
Structural Engineering
Civil Engineering
3D Building Assessments
Topographic, Hydrographic, Oceanographic and Geophysical Surveys
Project and Site Management
Monitoring and Testing
Environmental Stewardship
Integrated Building Design
Infrastructure & Environment
Structural Engineering and Building Assessment
Geotechnical Engineering
Topographic / Hydrographic / Oceanographic / Geophysical / Building Surveys
Project and construction management
Job Openings
Students
Media
News
Contact Press
Andrea Schmidt-Schwonbeck
Phone: +49 (0)381 45 67 951
email:
presse@inros-lackner.de
News
New port for Uganda
Master plan and preliminary design for Bukasa Port
Flood protection for the Ilmenau canal
Contract awarded for design of Nettelberg floodwater control gate and pumping station
Flood protection for the Ilmenau canal
Contract awarded for design of Nettelberg floodwater control gate and pumping station
Onshore power supply system for ships at cruise port
Special recognition during awards ceremony for the planning and design of this climate-friendly project in Rostock-Warnemünde
"Museum of the Year 2020"
Award for INROS LACKNER project
Opening of the Humboldt Forum in Berlin
Largest ventilation planning and design project in INROS LACKNER’s history
Inauguration of Supreme Court building in Vietnam
Design, general planning and implementation completed in record time
1
...
3
4
5
6
7
8
9
10
11
12
13
14
15
Go to top